Pricing

Trademark Registration Fees in Turkey 2027: Official Fees, Increase Timing and Total Cost

Published: 12 min read
Trademark Registration Fees in Turkey 2027: Official Fees, Increase Timing and Total Cost

There is no official list of trademark registration fees in Turkey for 2027 yet. TÜRKPATENT (Turkish Patent and Trademark Office) still had no fee communiqué out for the new year when we checked on November 8, 2026, so every payment made today is calculated under the 2026 schedule. Under the 2026 schedule, a single-class trademark comes to TRY 9,830 in official fees: TRY 2,820 is paid with the application and TRY 7,010 at the registration stage. The two payments do not have to fall in the same year. If you file in December, you lock in the 2026 application fee, but you pay the registration fee in 2027, at whatever schedule applies on the payment date.

Once the new communiqué appears in the Official Gazette, we will rework the tables here with the 2027 amounts.

When Will the 2027 Trademark Fee Schedule Be Published?

No date is announced in advance, and the schedule does not land on the same day every year. The 2025 and 2026 schedules were both published on December 31 of the preceding year, in the fifth duplicate (mükerrer) issue of the Official Gazette, and took effect on January 1. The 2024 schedule, by contrast, came out on April 24, 2024. A late-December release is simply what happened in the last two years; it is not a binding calendar.

Fee yearCommuniquéOfficial Gazette
2024BİK/TÜRKPATENT: 2024/1April 24, 2024, No. 32526
2025BİK/TÜRKPATENT: 2025/1December 31, 2024, No. 32769 (5th duplicate issue)
2026BİK/TÜRKPATENT: 2026/1December 31, 2025, No. 33124 (5th duplicate issue)
2027Not published as of November 8, 2026–

The 2026 communiqué repealed the 2025 one in its Article 11 and took effect on January 1, 2026 under its Article 12. The practical rule is this: whatever you pay the Office is the total applied on the payment day. Waiting for the communiqué does not keep last year's amount alive in January, though. The 2024 one was only published in April, yet on January 14, 2024 the trademark page already showed the single-class filing fee at TRY 1,498.24 under the heading "2024 Fees" (it had been TRY 1,030.54 in September 2023). After the communiqué, the amount became TRY 1,630. The reason is that the Office fee part of the total follows the communiqué, while the duty part follows the Fees Law.

The quickest way to tell whether the new schedule is live is the heading of TÜRKPATENT's trademark fees page; in November 2026 the title on that page was still "2026 İşlem Ücretleri" (2026 Fees). If you want to see patent, design and utility model amounts alongside the trademark figures, the TÜRKPATENT fee schedule for 2027 brings every type of right together in one place.

Which Amounts Do You Pay Today?

Today every trademark transaction is paid under the 2026 schedule; for a payment after January 1, that day's page and the EPATS accrual show the amount. The detail worth knowing when you read that schedule is what the amounts include. Article 1 of the communiqué makes clear that the TÜRKPATENT fee on its own is not what you pay: VAT is added to it, and so is a duty whenever the transaction also carries one under the Fees Law (Harçlar Kanunu), Tariff No. 8. The amount that reaches the Office is the sum of those three parts.

The breakdown is easiest to see on the patent side, because the patent fees page shows the three parts in separate columns: the patent application fee (01.01.01) is made up of a TRY 81.42 fee, TRY 16.28 in VAT and a TRY 522.30 duty, for a total of TRY 620. The trademark page does not show this split and lists only the total. That total is what you actually pay, and every table here uses total amounts.

Two core items take a trademark to registration, and their 2026 amounts are as follows: code 02.01.01 sets the first-class application fee at TRY 2,820, and code 02.01.03 sets the registration fee, which does not change with the number of classes, at TRY 7,010. A second class also costs TRY 2,820; each class added from the third onward costs TRY 3,150. Situational items such as priority, division or the 35/5 group are listed in full, with their codes, in the 2026 trademark registration fees breakdown.

How Much Did Trademark Fees Rise From 2025 to 2026?

Core trademark items rose by roughly 20–21% in 2026; the registration and renewal fees sat at the top of that band and the application fee at the bottom. The table compares the total amounts shown in the 2025 and 2026 versions of the TÜRKPATENT page:

Item (code)20252026Increase
Application fee, first class (02.01.01)TRY 2,350TRY 2,82020.0%
Additional class, second class (02.01.02)TRY 2,350TRY 2,82020.0%
Additional class, third and each further class (02.01.28)TRY 2,610TRY 3,15020.7%
Registration fee (02.01.03)TRY 5,790TRY 7,01021.1%
Renewal, up to 2 classes (02.01.23)TRY 7,210TRY 8,73021.1%
Official total, 1 classTRY 8,140TRY 9,83020.8%
Official total, 2 classesTRY 10,490TRY 12,65020.6%

The official total rows add up the application and registration fees; situational items such as priority are left out.

Put in lira, the registration fee went up by TRY 1,220 in a single year and a one-class mark's official total by TRY 1,690. Most of the increase sits in the item paid after filing, and that is exactly what makes the registration line the most sensitive one in a December filing budget.

Does the revaluation rate give you the 2027 amount?

It does not. The revaluation rate for 2026 was 25.49%, while trademark totals rose by 20–21%, and patent items showed increases that departed from the rate and varied from one item to the next. The rate is used to update taxes, duties and penalties; TÜRKPATENT's totals are not tied to it automatically. Taking the 27.83% rate for 2027, announced in early November 2026, and multiplying today's amounts by it to produce a "2027 price" is a method that does not even hold up against last year's figures.

In a December Filing, Which Fee Falls Under Which Year's Schedule?

The application fee follows the schedule in force on the filing date, and the registration fee follows the schedule in force on the payment date; in a December filing those two dates land in different calendar years. The reason lies in how Industrial Property Law No. 6769 (SMK) orders the procedure. Article 11(1)(ç) counts information on payment of the application fee among the required elements of an application, so the fee is paid together with the filing. The registration fee, on the other hand, is only requested once the opposition stage has closed (SMK Art. 22(1)). After publication in the Official Trademark Bulletin, third parties have two months to file an opposition (SMK Art. 18).

The arithmetic is simple: for an application filed in the last weeks of 2026, even if publication happens on the earliest possible date, the opposition period runs into 2027, and the registration fee is requested on the 2027 calendar. Here is how the two items split under today's schedule:

ClassesPaid on filing (2026 schedule)Registration fee, 02.01.03 (2026 amount)Official total at 2026 rates
1 classTRY 2,820TRY 7,010TRY 9,830
2 classesTRY 5,640TRY 7,010TRY 12,650
3 classesTRY 8,790TRY 7,010TRY 15,800

In a December filing, the first amount column becomes final on the day you pay it. The registration column will be repriced at the schedule in force on the payment date, so read the last column as a calculation at today's rates rather than as a final total.

For owners who filed earlier in the year and receive the registration fee notice in December, the picture flips. If you pay in December, the 2026 amount of TRY 7,010 applies; if you leave the payment for the new year because the deadline in the notice runs into January, you accept whichever schedule governs that later date. How that deadline works and what happens if you miss it are covered in the unpaid registration fee explainer. The same rule carries on after registration: renewal at the end of the ten-year term (SMK Art. 23), or recording an assignment or a license, is charged under the schedule current on the payment day.

What Is Added to the Official Fee in the Total Cost?

On top of the official fee comes the attorney's service fee; the two are separate items and should sit on separate lines in any quote. The Office's schedule does not depend on who is applying. What changes from one attorney to another is the scope of the work and the price asked for it: the similarity search, preparing the list of goods and services, monitoring correspondence with the Office and, if an opposition comes in, the defense. Applicants resident in Turkey can file on their own through EPATS, the Office's online filing system; applicants resident abroad must be represented before the Office by an attorney (SMK Art. 160(3)).

Quotes obtained at year-end raise one more decisive question: if the quote includes official fees, which year's schedule does it use for the registration fee? If a price given in December includes the 2026 registration fee and the payment will be made in 2027, settle in writing who covers the difference in the schedule. You can compare Webx packages and the stages each one covers on the pricing page. If you also plan to take the mark abroad, WIPO fees run on a separate track in Swiss francs; that calculation is in the international trademark registration costs piece.

How Do You Build a Budget for a Year-End Filing in 6 Steps?

A good budget shows the items that are already fixed and the items that are still open on separate lines. Follow this order:

  1. Settle the classes. The application stage grows with each class, while the registration fee stays a single item; we discuss how many classes are enough in the piece on choosing the number of classes.
  2. Finish the search before you file. Run a first screen with trademark search, then ask for a written similarity assessment.
  3. Calculate the application stage at 2026 amounts: TRY 2,820 each for the first and second classes, and TRY 3,150 for every class after that.
  4. Put the registration fee on its own line at TRY 7,010 and note next to it that the new communiqué will change it.
  5. Keep the attorney's fee on a third line, and get in writing how the quote behaves when the schedule changes.
  6. At New Year and again when the 2027 communiqué appears in the Official Gazette, correct the registration line to the new amount on TÜRKPATENT's page, and update later items such as renewal on the same day.

Fictional example: Velbora's December filing

Fictional example: Velbora is a small business selling handmade soap and personal care products. It wants to protect its mark in two classes, and its search came back clear in the first week of December. If it files before the year is out, it pays 2,820 + 2,820 = TRY 5,640 for the application stage, and that amount is fixed on the day.

The registration fee will be requested after publication in the bulletin and the two-month opposition period, which means in 2027. Velbora enters this line in its budget at today's TRY 7,010 and sees a total of TRY 12,650, but it keeps the registration line open: once the communiqué is out, it will replace the figure with the new amount. The registration fee rose by 21.1% last year; the business reads that rate not as a forecast but as a reminder that this particular line can move.

Had Velbora pushed the filing to January, both items would have been paid at the amounts applied in January, and its filing date would have moved later as well; with the search already done, waiting gains nothing. Had the search not been finished, the math would flip: filing without a search just to capture the schedule difference on the application stage would put the full TRY 5,640 at risk if the application were refused.

Mistakes That Throw Off a Budget During a Fee Increase

What these mistakes have in common is treating two separate payments as a single number:

  • Budgeting only for the application stage. For a single-class mark, the TRY 2,820 paid on filing is the smaller part of the official total; the TRY 7,010 registration fee comes later and, in a December filing, falls under the new year's schedule.
  • Not asking which official items the quote includes. Does "official fees included" cover the registration fee, and if it does, at which year's amount? Without those two answers you cannot compare two quotes.
  • Filing without a search for fear of the increase. If the search is skipped to beat the year-end, all you gain is the schedule difference on the application stage. If the application is refused, fees paid are not refunded as a rule (SMK Art. 161(4)); the exceptions are set out in the piece on fee refunds after a refusal.
  • Leaving oppositions out of the budget. If you need to oppose someone else's application or appeal a decision of the Office, separate official fees apply; if someone opposes yours, a response to that opposition carries no separate line in the schedule, but the attorney's fee for the defense belongs in the budget. The amounts are in the trademark opposition fees piece.

Keep the Budget on Two Lines Until the Communiqué Is Out

In a trademark budget, the certain part is what you pay today; the registration fee is a second line tied to whichever schedule is current when it is paid. If you are filing in December, close the first line at the 2026 amount and update the second when the communiqué is published. If you would like to run the whole process together, from the search and the filing to tracking the registration fee notice, take a look at the scope of our trademark registration service.

Sources

Want to see our trademark guides first in Google Search?

Add as a preferred source on Google

Frequently Asked Questions

If the 2027 communiqué is not out by New Year, what amount is paid in January?
TÜRKPATENT charges whatever total it has in force on the payment day, and that total can change even if the communiqué is late. The 2024 schedule appeared in the Official Gazette of April 24, 2024, yet the trademark fees page showed new totals in January 2024, because the duty part follows the Fees Law. For a January payment, check the amount on that day's page and in the EPATS accrual.
Are Ministry of National Education schools and students exempt from trademark fees?
No. The Article 9 exemption in the communiqué reaches MEB (Ministry of National Education) schools, institutions and their students only for certain patent, utility model and design items; none of the exempt codes comes from the trademark table. The waiver for university student competitions run by TÜRKPATENT is likewise limited to patent filing, search and examination fees. A school filing a trademark pays the listed amounts.
How are trademark fees paid to TÜRKPATENT?
The fee communiqué sets out two ways: create an accrual (tahakkuk) for the transaction in EPATS and pay that amount into the Office's account, or pay by credit card. If you work with an attorney, agree at the outset who makes the payment and when you will receive the receipt. At year-end the payment date decides the schedule, so the receipt date also becomes the basis of your budget entry.
If I extend my mark abroad through the Madrid system, what do I pay TÜRKPATENT?
Under the 2026 schedule you pay TRY 3,850 for forwarding the international application to WIPO (02.01.19), or TRY 3,350 for an international application with Turkish wording (02.01.35); forwarding a subsequent designation costs TRY 1,630 (02.01.20). WIPO's basic and country fees come on top. They are set in Swiss francs in a separate table, and their lira equivalent depends on the exchange rate on the day you pay.
Will an application fee I have already paid be recalculated under the 2027 schedule?
No. A payment to the Office is settled at the amount applied on the day you made it; a change at New Year or under a new communiqué affects only later payments. If you filed and paid in 2026, that item is closed. Items paid later in the same file, such as the registration fee or a fee for correcting the classification list, follow the schedule in force on the day they are paid.
Are there recurring fees for a trademark after registration?
The trademark schedule has no annual fee item; the recurring payment is the renewal fee at the end of each ten-year term (SMK Art. 23). In the 2026 schedule, renewal covering up to two classes costs TRY 8,730, and each additional class from the third onward costs TRY 750. Recording an assignment, a license or a pledge arises only if that transaction takes place, at the schedule in force on the payment date.