Pricing

2027 TÜRKPATENT Fee Schedule: Trademark, Patent, Design and Utility Model Fees

Published: 13 min read
2027 TÜRKPATENT Fee Schedule: Trademark, Patent, Design and Utility Model Fees

The TÜRKPATENT fee schedule for 2027 is made up of the office fee in the yearly communiqué that TÜRKPATENT (Turkish Patent and Trademark Office) issues, VAT, and the duties set under the Fees Law, and as of 8 November 2026 the 2027 communiqué has not been published; the fee pages still show 2026 amounts. Official fees paid in November and December 2026 are 2026 amounts: TRY 9,830 for a single-class trademark, TRY 14,780 for a company patent, TRY 9,600 for a company utility model and TRY 2,070 to file a single design.

Payments made from 1 January 2027 may already face a different total, since the duty component does not wait for the communiqué. The tables will be updated once the new amounts appear; until then we are not publishing estimates.

How and when is the 2027 fee schedule published?

The share of the total that goes to the office is fixed each year by a single communiqué, and a new communiqué repeals the previous one on the day it takes effect; the duty part, by contrast, depends on the Fees Law. The text in force today is titled "Communiqué on the Fee Schedule to Be Applied by the Turkish Patent and Trademark Office in 2026 (BİK/TÜRKPATENT: 2026/1)" and came out on 31.12.2025 in Official Gazette No. 33124, as its 5th repeat (mükerrer) issue. It took effect on 1.1.2026 and repealed the 2025 schedule (Art. 11, Art. 12).

The publication date is not fixed. The 2025 communiqué (2025/1) ran in Official Gazette No. 32769 of 31.12.2024, also as a 5th repeat issue, while the 2024 communiqué (2024/1) was published in Official Gazette No. 32526 dated 24.4.2024. Both of the last two came out on 31 December; in 2024 the communiqué came late, yet the amount did not stay put in January. TÜRKPATENT's trademark page was already showing new amounts in February 2024 with the heading "2024 Yılı İşlem Ücretleri" (Transaction Fees for 2024):

Date of the pageSingle-class applicationRegistration fee
September 2023TRY 1,030.54TRY 2,536.60
February 2024, before the communiquéTRY 1,498.24TRY 3,522.95
May 2024, after the communiquéTRY 1,630TRY 4,020

The in-between figure in February comes from the total drawing on two sources: the duty part can change with the new year, while the office fee waits for the communiqué.

The first article of the communiqué defines what an amount covers: the office's fee leaves out both VAT and the duties listed in Tariff No. 8 under the Fees Law (Harçlar Kanunu), which means the amount you pay adds up three parts (Art. 1(1)). The patent fee page shows the parts in separate columns; a patent application breaks down into an office fee of TRY 81.42, VAT of TRY 16.28 and a duty of TRY 522.30, for TRY 620 in all. Every amount in this list is a total as well.

The fees are split into six schedules by type of right:

  • Schedule 1: patents, utility models and integrated circuit topographies
  • Schedule 2: trademarks
  • Schedule 3: geographical indications and traditional product names
  • Schedule 4: designs
  • Schedule 5: appeals to the Re-examination and Evaluation Department (YİDK)
  • Schedule 6: patent and trademark attorney procedures

When the 2027 communiqué arrives, these schedules and the fee pages that publish them are renewed. For payments, the date decides: every payment to the office is made at the total TÜRKPATENT applies on the day of payment, so a registration, certificate or renewal fee requested later on a file opened in 2026 is tied to the amount on the day you pay.

The four rights side by side

Under the 2026 schedule, the official floor for reaching registration is lowest for a design and highest for a company patent; the real gap, though, opens up in the maintenance fees paid over the life of the right.

RightOfficial floor to registration (2026)Term of protectionMaintenance fee (2026)
TrademarkTRY 9,830 (1 class)10 years, extended by renewalRenewal TRY 8,730 (up to 2 classes)
PatentCompany TRY 14,780 / individual TRY 9,48020 years, cannot be extendedAnnual fee: TRY 3,800 in year 3, TRY 26,650 in year 20
Utility modelCompany TRY 9,600 / individual TRY 6,95010 years, cannot be extendedAnnual fee: TRY 3,250 in year 3, TRY 7,820 in year 10
DesignTRY 2,070 + TRY 280 per 8x8 cm publication area5 years, up to 25 with renewalsRenewal TRY 6,340 (single design)

The floors include only the mandatory stages; optional items such as extra classes, priority claims and additional designs stay outside them. From 2025 to 2026 the floor rose by 20.8% for a single-class trademark, 23.9% for a company patent, 23.1% for a company utility model and 19.7% for a design application. If you have not yet decided which right fits your product, the comparison of the four rights will simplify the budget as well.

How much are trademark registration fees under the 2026 schedule?

For one class, the 2026 total of the trademark application fee and registration fee is TRY 9,830; for two classes it is TRY 12,650. Each class from the third onward adds TRY 3,150 at the application stage.

Item (code)20252026
Single-class application (02.01.01)TRY 2,350TRY 2,820
Additional fee for the second class (02.01.02)TRY 2,350TRY 2,820
Third and each further class, excluding the 35/5 item (02.01.28)TRY 2,610TRY 3,150
Registration fee (02.01.03)TRY 5,790TRY 7,010
Renewal, up to 2 classes (02.01.23)TRY 7,210TRY 8,730

Keep the two payments apart: the application fee is paid with the application, and the registration fee falls due after the opposition stage is over (SMK, the Industrial Property Law No. 6769, Art. 22(1)). If the months in between cross New Year, the second payment is made at the amount in force in 2027; the effect on your budget is worked out in trademark registration fees in Turkey 2027. Every other item, including the 35/5 group, priority and division, is listed in the line-by-line breakdown of the 2026 trademark schedule.

Where do patent and utility model fees part ways?

Both rights sit in the same schedule and share the same application fee (TRY 620); they diverge because the utility model schedule has no examination report item and its annual fees stop at year 10.

Patent

Item (code)20252026
Application (01.01.01)TRY 520TRY 620
Search report, individual / other (01.01.48 / 01.01.49)TRY 2,020 / 4,130TRY 2,530 / 5,180
Examination report, individual / other (01.01.50 / 01.01.51)TRY 2,020 / 4,130TRY 2,530 / 5,180
Patent certificate (01.01.08)TRY 3,150TRY 3,800
Annual fee, year 3 / year 20 (01.01.23–01.01.40)TRY 3,150 / 21,360TRY 3,800 / 26,650

The search and examination lines each carry two prices: within a calendar year, an individual pays the lower one on the first 10 requests made via e-Devlet, the state's online services portal, and a university on its first 100. The 2026 schedule also opened separate lines for SMEs: for first applications by legal persons in the KOBİ Enterprise category holding a KOBİ Qualification Certificate, the application costs TRY 546.73 and the search and examination reports TRY 1,295 each.

A patent keeps asking for annual fees for as long as it lives; the lines for years 3 to 20 add up to TRY 250,720 at 2026 amounts. A stage-by-stage calculation and the late-payment surcharges are in patent fees in Turkey 2027, and what an attorney-led filing covers is described on the patent registration service page.

Utility model

Item (code)20252026
Application (01.02.01)TRY 520TRY 620
Search report, individual / other (01.02.30 / 01.02.31)TRY 2,020 / 4,130TRY 2,530 / 5,180
Utility model certificate (01.02.05)TRY 3,150TRY 3,800
Annual fee, year 3 / year 10 (from the 01.02.17–01.02.25 range)TRY 2,710 / 6,350TRY 3,250 / 7,820

The schedule also carries an annual fee line for year 2 (TRY 3,190). Add up the first 10 years for a company and you get TRY 71,100 for a patent (floor 14,780 + years 3–10 56,320) against TRY 54,650 for a utility model (9,600 + 45,050); in exchange, a patent can be protected for up to 20 years. Conversion fees and the kinds of invention a utility model cannot protect are covered in the 2027 utility model fee guide.

What drives the total for a design registration?

With designs, the number of designs in the application and the image area to be published shape the bill more than the filing fee itself.

Item (code)20252026
Application, single design (04.01.01)TRY 1,730TRY 2,070
Additional design: 2nd / each of 3rd–5th / each from 6th on (04.01.02)Page showed a calculation note instead of an amountTRY 1,674.90 / TRY 318.70 / TRY 760
Publication, per 8x8 cm area (04.01.03)TRY 230TRY 280
Deferred publication, per design (04.01.04)TRY 230TRY 280
Renewal, single design (04.01.05)TRY 5,280TRY 6,340

Under Art. 53(3) of the SMK Implementing Regulation, a publication fee is paid for each 8x8 cm area you ask to publish, and an image larger than that triggers an extra fee. Assuming one design with 4 images that do not exceed 8x8 cm, the official amount is 2,070 + 4 × 280 = TRY 3,190. Protection lasts 5 years and can be stretched to 25 through five-year renewals (SMK Art. 69(1)); four renewals for a single design come to TRY 25,360 at 2026 amounts. The tiered cost of a multiple application, and which year's schedule applies to a deferred publication, are explained in design registration fees in Turkey 2027.

Which schedule holds the YİDK appeal fees, and how much are they?

Fees for appeals against the office's decisions are gathered in Schedule 5 and published on the re-examination and evaluation fee page; an appeal against a trademark decision costs TRY 2,720 in 2026.

Item (code)20252026
Trademark: appeal against an office decision (05.01.01)TRY 2,170TRY 2,720
Geographical indication and traditional product name appeals (05.01.02–05)TRY 810TRY 1,010
Opposition to the publication of a design registration, per design (05.01.06)TRY 260TRY 320
Opposition to the publication of a patent grant decision (05.01.07)TRY 4,130TRY 5,180
Integrated circuit topography: appeal against a decision (05.01.08)TRY 4,220TRY 5,290

The trademark appeal fee rose 25.3% in one year. One item that is not in this schedule often gets mixed up with it: a third party's opposition against a filing that has appeared in the Official Trademark Bulletin sits in the trademark schedule under code 02.01.17 at TRY 1,150 and must be filed within 2 months of publication (SMK Art. 18); the deadline for appealing an office decision is also 2 months (Art. 20). All trademark dispute fees, including the cancellation request and its deposit, are set out in trademark opposition fees in Turkey 2027.

What do assignment and licence recordals cost for each right?

Recording an assignment costs the same for patents, utility models and designs (TRY 5,520) and TRY 5,960 for a trademark; among licence recordals, the trademark line is the highest.

Right (codes)Assignment recordalLicence recordal
Trademark (02.01.06 / 02.01.09)TRY 5,960TRY 9,870
Patent (01.01.10 / 01.01.11)TRY 5,520TRY 3,150
Utility model (01.02.06 / 01.02.07)TRY 5,520TRY 3,150
Design (04.01.09 / 04.01.10)TRY 5,520TRY 8,540

The trademark licence item also covers licence renewal. The full cost of a trademark assignment, notary and contract costs included, is worked out in the trademark assignment fee guide.

Fictional example: a manufacturer's annual budget across three rights

Fictional example: Velunay Armatür is a company that makes bathroom faucets. In autumn 2026 it lists the official items for the next twelve months: a 2-class trademark application for a new product line, a single faucet design with 6 images, none larger than 8x8 cm, a utility model in the company's name and the renewal of an older 2-class trademark.

Item (code)CalculationAt 2026 amounts
Trademark application, 2 classes (02.01.01 + 02.01.02)2,820 + 2,820TRY 5,640
Registration fee for the same mark (02.01.03)Single itemTRY 7,010
Single design with 6 publication areas (04.01.01 + 04.01.03)2,070 + 6 × 280TRY 3,750
Utility model, company (01.02.01 + 01.02.31 + 01.02.05)620 + 5,180 + 3,800TRY 9,600
Renewal of the older mark, 2 classes (02.01.23)Single itemTRY 8,730
TotalFive itemsTRY 34,730

That total does not belong to a single schedule. Application fees are paid when each file is opened, so they can be locked in at 2026 amounts; the registration fee is requested after the opposition stage and the utility model certificate fee at the end of the search process, while the renewal date depends on the mark's term of protection. If those items fall into 2027, they are paid at the total in force on the payment day. That is why Velunay keeps its budget in two columns: items closed at 2026 amounts by the end of December, and items to be rewritten from January.

Where can you check the 2027 amounts yourself?

The two places to watch are TÜRKPATENT's fee pages, which are split by type of right, and the communiqué text in the Official Gazette; the exact amount, though, is shown by the accrual (tahakkuk) you generate in EPATS, the office's electronic filing platform, before you pay.

  1. Look at the year in the title of the fee page; as of 8 November 2026 the pages read "2026 İşlem Ücretleri" (2026 Transaction Fees).
  2. Find the TÜRKPATENT fee schedule communiqué in the Official Gazette and read its final articles; in the 2026 communiqué, entry into force and the repealed communiqué were handled in Art. 11 and Art. 12.
  3. Match lines by item code, not by name; new items added in 2026, such as the KOBİ and Teknogirişim (tech start-up badge) lines, are easiest to spot by their codes.
  4. Check whether an amount is the total or only the office fee. On the patent page, fee, VAT and duty sit in separate columns; put the total in your budget.
  5. Look for a discount or exemption line that fits you: the KOBİ line, individual and university requests made through e-Devlet, and the exemption for Ministry of National Education (MEB) schools and their students.
  6. Before paying, generate the accrual in EPATS and compare the amount on the payment day with your own table. It can be paid into the office's bank account or by credit card; the screen sequence is shown in the EPATS trademark filing walkthrough.

Where do people misread the fee tables?

Most misreadings come from putting a rate from outside the communiqué, or an incomplete item, in place of the schedule itself.

  • Applying the revaluation rate to the office fee. The 27.83% announced for 2027 in early November 2026 is the basis for taxes, duties and fines; it does not pass automatically into TÜRKPATENT totals. The rate set for 2026 was 25.49%, and every official floor rose by less than that.
  • Budgeting a January payment at 2026 amounts because no communiqué is out. The duty part does not wait for the communiqué; for a payment from 1 January on, the EPATS accrual gives the exact figure.
  • Leaving maintenance fees out of the plan. At 2026 amounts, years 3 to 10 of a company patent cost TRY 56,320, several times the registration floor.
  • Budgeting a foreign filing with this list. On the Madrid route, the notification fee paid to TÜRKPATENT (02.01.19, TRY 3,850) is only the first layer; WIPO fees sit in a separate table in Swiss francs. The layer-by-layer calculation is in international trademark registration costs 2027.

Planning year-end payments and the 2027 calendar together

Once the 2027 amounts appear on TÜRKPATENT's pages or in the Official Gazette, the tables in this list will be updated. Until then, the soundest plan is to write down every item with its 2026 amount and its likely payment date, and to flag separately whatever falls on or after 1 January. If you want a trademark attorney authorised before TÜRKPATENT to run your trademark files, the steps of our trademark registration service are laid out on its page. Webx's service fees are kept separate from official fees and are shown package by package on the pricing page.

Sources

Want to see our trademark guides first in Google Search?

Add as a preferred source on Google

Frequently Asked Questions

Does the TÜRKPATENT schedule include attorney service fees?
No. The sixth schedule of the communiqué lists the office's own fees for attorney-related procedures; the service fee an attorney charges a client for a file is not in the communiqué, and each attorney sets their own price. When you get a quote, ask in writing which official items are included and which will be requested separately, so the budget has no gaps from the start.
Which registration fees are schools and students exempt from?
Under Art. 9 of the communiqué, schools run by MEB (the Ministry of National Education), its other institutions and the pupils enrolled in them are relieved of patent application, search and examination fees (1.01.01; 1.01.48 to 1.01.51), utility model application and search fees (1.02.01, 1.02.30, 1.02.31) and design items 4.01.01 to 4.01.03. Filings made under TÜRKPATENT competitions aimed at university students skip the patent application, search and examination fees as well.
Why does a search request filed through e-Devlet cost less?
Art. 3(5) of the communiqué gives individuals the discounted line on their first 10, and universities on their first 100, search and examination requests made via e-Devlet in the same calendar year. For patents that line is TRY 2,530, against TRY 5,180 for other applications. Once the limit is passed, or if the applicant belongs to neither group, the "other applications" line applies.
Does an application lapse if an official fee is underpaid?
Not always. Under SMK Art. 161(3), the office tells you how much is missing, and you have one month from that notice to pay the difference; that option does not exist for fees tied to Art. 15, 18, 20, 23 and 69, meaning procedures such as oppositions and renewals. If proof of payment never reaches the office in time, Art. 161(1) treats the application as withdrawn.
Can you get an official fee refunded?
As a rule, no. SMK Art. 161(4) says that unless the law provides otherwise, paid fees are not returned and are booked as office revenue. One item sits apart from the fees: the deposit paid with a cancellation request goes to the trademark owner if the request is fully rejected, and to the requester, on request, if it is fully accepted. Where a letter of consent leads the office to withdraw a refusal, the appeal fee paid against it still stays with the office.
Why are geographical indication registration fees not in this list?
Fees for geographical indications and traditional product names are kept in Schedule 3, and this list includes only the appeal lines for that right: lines 05.01.02 through 05.01.05 of the re-examination and evaluation schedule are set at TRY 1,010 in 2026. For application and registration amounts, open TÜRKPATENT's fee page for geographical indications and traditional product names on the day you pay.